Tagged: Wexner Medical Center Outpatient Care Powell
bartholomew.185@osu.edu | July 24, 2026
Facilities Design and Construction (FDC) joined leaders from The Ohio State University Wexner Medical Center, community leaders and members on July 23 to celebrate the completion of Outpatient Care Powell with a ribbon cutting ceremony.
“Projects like Outpatient Care Powell are successful because of the dedication, expertise and collaboration of so many people working toward a shared goal,” said Kristin Poldemann, associate vice president of FDC. “It’s rewarding to see this facility completed and ready to serve patients and the Powell community.”
bartholomew.185@osu.edu | July 15, 2026
Construction at Outpatient Care Powell is less than a month away from completion as crews focus on completing punch list items, adding final touches throughout the facility and supporting move-in activities. Furniture is being installed throughout patient and public spaces, and clinical areas are seeing final touchups.
bartholomew.185@osu.edu | April 27, 2026
Construction at Outpatient Care Powell is entering its final stretch, with the project now 90% complete. Teams are focused on finalizing interior finishes, deploying furniture, completing IT installation and conducting testing and balancing to prepare the facility for opening.
bartholomew.185@osu.edu | November 19, 2025
Construction on The Ohio State University Wexner Medical Center Outpatient Care Powell is roughly 70% complete. Crews are finishing metal panels on the exterior as landscaping wraps up. Inside, final painting is underway, and flooring installation is progressing in several areas.
bartholomew.185@osu.edu | July 31, 2025
Construction on The Ohio State University Wexner Medical Center Outpatient Care Powell is now 56% complete, with nearly every trade actively engaged in advancing the project. The mechanical, electrical and plumbing (MEP) systems are being installed throughout the building, while interior finishes, including drywall and ceiling grids, are taking shape across multiple floors.
mckivergan.1@osu.edu | March 25, 2025
Construction on The Ohio State University Wexner Medical Center Outpatient Care Powell is about 42% done with just about every tradesperson conducting work on the building. From masonry and roofing, to framing and mechanical electric and plumbing (MEP), significant progress is being made. Precast on the exterior of the building is now complete as brick and windows are being installed.
Construction progress includes:
mckivergan.1@osu.edu | January 29, 2025
Work on The Ohio State University Wexner Medical Center Outpatient Care Powell is nearing 33% completion. Crews are just beginning framing and overhead ceiling work on the fourth floor, while already complete on floors two and three. Installation of the roof on the Ambulatory Healthcare Center (AHC) is 80% complete. Final grading and seeding are slated for the coming months as crews also begin tree planting.
mckivergan.1@osu.edu | November 22, 2024
Construction on The Ohio State University Wexner Medical Center Outpatient Care Powell is nearly 30% complete. Currently, crews are working on interior metal framing, electrical, plumbing, and heating, ventilation and air conditioning (HVAC) on levels two and three. Crews are also working to install roofing to both the five-story medical office building and two-story ambulatory health center.
mckivergan.1@osu.edu | August 28, 2024
The Ohio State University Wexner Medical Center Outpatient Care Powell is a vision starting to come to life as crews began vertical construction in early July. Underground utilities are being installed and crews are preparing for concrete pours. Site paving is taking place and masons are hard at work on the site wall.
hedman.11@osu.edu | April 3, 2024
Outpatient Care Powell is a $183 million project that will include a two-story health center and an attached five-story medical office building.