Ohio State is in the process of revising websites and program materials to accurately reflect compliance with the law. While this work occurs, language referencing protected class status or other activities prohibited by Ohio Senate Bill 1 may still appear in some places. However, all programs and activities are being administered in compliance with federal and state law.

Main navigation

Biomedical and Materials Engineering Complex Phase 2

The Biomedical and Materials Engineering Complex (BMEC) Phase 2 is a $94.3 million project that maximizes collaborative learning and research. It will be the home of first-year engineering courses, makerspace, biomedical and advanced materials R&D, and engaging K-12 STEM programs.

The project included the demolition of Watts Hall and renovates existing MacQuigg Hall. An addition will be constructed that will house research and teaching labs, collaboration spaces, offices and classroom space. BMEC Phase 1, later renamed Mars G. Fontana Laboratories, opened in August 2020 and was a $59.1 million project that renovated the former Koffolt Lab and Fontana Lab to create additional research, classroom and office space. It houses the Departments of Biomedical Engineering and Materials Sciences and Engineering.

Project Timeline

  • 2021
  • 2023
  • 2026

Live Updates

Looking northwest toward the Biomedical and Materials Engineering Complex Phase 2 project.

Project Team

Shaun Allen Headshot

 

Project Manager 
Shaun Allen

Consultants
AE/Design Architect: DLR Group

Construction Manager
Walsh Construction

News

  • An exterior view of the building.

    Biomedical and Materials Engineering Complex Phase 2

    Construction on the Biomedical and Materials Engineering Complex Phase 2 (BMEC) is more than 78% complete with construction as crews have begun installing the glass to the beacon at the south elevation. A bike shelter has been installed at Magee Plaza and the loading dock is complete.
  • credit: Alumni Magazine / Todd Bayha

    In the News: The New Face of Our Campus

    The Spring 2025 edition of Ohio State’s Alumni Magazine highlighted 23 buildings on the university’s Columbus campus
  • Crews digging a large hole.

    Slideshow: Biomedical and Materials Engineering Complex Phase 2

    Work on the Biomedical and Materials Engineering Complex (BMEC) Phase 2 is passing the halfway point, at nearly 53% complete. Crews are preparing to pour the second interior stairwell and then will be able to remove the exterior temporary set.