Ohio State is in the process of revising websites and program materials to accurately reflect compliance with the law. While this work occurs, language referencing protected class status or other activities prohibited by Ohio Senate Bill 1 may still appear in some places. However, all programs and activities are being administered in compliance with federal and state law.

The Ohio State University Wexner Medical Center University Hospital

Ohio State took major step forward with the development of a new Ohio State University Hospital, combined with modern educational space, to enhance a unified Ohio State Wexner Medical Center campus providing leading-edge research, outstanding clinical training and world-class patient care. 

The 1.9 million-square-foot University Hospital is the largest single facilities project ever undertaken at Ohio State with up to 820 beds in private-room settings to elevate patient-centered care, safety and training for the next generation of health care providers.

Scheduled to open in early 2026, planning is years in the making and advances Framework 2.0, the university’s long-term planning vision, as well as the Wexner Medical Center strategic plan.

Learn more about the inpatient tower by visiting the Wexner Medical Center website.

Additional Details

University Hospital has a total project cost of $1.9 billion and will be located east of Cannon Drive. It creates stronger connections with The Ohio State University Comprehensive Cancer Center – Arthur G. James Cancer Hospital and Richard J. Solove Research Institute (OSUCCC–James), Rhodes Hall, Doan Hall, the Richard M. Ross Heart Hospital and the Brain and Spine Hospital. Additional project details include:

  • Up to 820 beds, replacing and expanding on the 440 beds in Rhodes Hall and Doan Hall.
  • The OSUCCC–James gains 148 beds – 84 new and 64 resulting from construction backfilling.
  • 51 neonatal intensive care unit bassinets.
  • State-of-the-art diagnostic, treatment and inpatient service areas; imaging; operating rooms; and critical care and medical/surgical beds.
  • Renovated OSUCCC–James and Ross Heart Hospital for blood bank, support services and building connections.
  • A new Wexner Medical Center Garage with 1,880+ spaces to serve patients and visitors.

Project Timeline

  • 2018
  • 2019
  • 2020
h2

Live Updates

Looking east toward University Hospital construction site
University Hospital, facing west

Project Team

Ragan Fallang Headshot

 

Project Managers
Ragan Fallang

Consultants
AE/Design Architect: Henningson, Durham & Richardson (HDR)

Construction Manager
Walsh/Turner (joint venture)