Biomedical and Materials Engineering Complex Phase 2
Construction on the Biomedical and Materials Engineering Complex Phase 2 (BMEC) is more than 78% complete with construction as crews have begun installing the glass to the beacon at the south elevation. A bike shelter has been installed at Magee Plaza and the loading dock is complete. -
Slideshow: Waterman - Multispecies Animal Learning Complex (MALC)
Construction on the Waterman Multispecies Animal Learning Complex has reached the 75% completion milestone. -
Walking with Heart and Sole
Team members from across Administration and Planning (A&P) once again joined hundreds of Buckeyes at the annual Central Ohio Heart Walk rallying together t